Tiam Sanat Alborz, with over two decades of experience in major industrial projects across the oil, gas, petrochemical, energy, and construction sectors, has successfully delivered numerous national projects. The company’s integrated engineering, procurement, and construction capabilities, supported by strict quality and safety oversight, highlight its strength in managing EPC projects of various scales.

2006 to 2009

2006 to 2009

Installation of 400 tons of hydraulic equipment and execution of 100,000 inches of piping for the Cold Rolling Unit.
Client: Mobarakeh Steel Company, Isfahan

Procurement and execution of rebar works, formwork, and concrete placement for the diversion tunnels of Karun 3 Dam using the PC method, including 10,000 tons of rebar, 200,000 m² of formwork, and 250,000 m³ of concrete work.
Client: Cyber International Company

Execution of Unit 51 piping networks at the Persian Gulf Star Oil Refinery, including 250,000 inches of piping and 800 tons of supports.
Client: Sazeh Pad Tehran

Procurement and construction (PC) of industrial and non-industrial buildings with a total area of 35,000 m².
Client: Cyber Company – Karun 3 Dam Power Plant

Execution of piping works for Phases 22, 23, and 24 of South Pars, along with related supports, including 500,000 inches of piping and 1,000 tons of supports.
Client: Payandan

2009 to 2011

2009 to 2011

stallation of 2,000 tons of heavy equipment, fabrication and installation of 1,000 tons of supports, and fabrication and installation of 200,000 inches of carbon steel piping.
Client: Jam Petrochemical Company

Fabrication and installation of steel structures and welding/installation of piping for Units 400–450, including 5,000 tons of structural steel and 100,000 inches of piping.
Client: Bou Ali Sina Petrochemical, Mahshahr

Welding and installation of three crude oil tanks (fixed and floating roof) with a total capacity of 300,000 barrels, installation of 7,000 tons of heavy equipment, 400,000 m² of pipeline insulation, and 700,000 m² of sandblasting and painting of all pipeline lines.
Client: Mahshahr Export Terminal

Procurement and construction (PC) of industrial and non-industrial buildings with an area of 30,000 m², along with installation and welding of 500,000 inches of carbon steel and stainless-steel piping for Phases 22, 23, and 24 of Assaluyeh.
Client: Payandan

2011 to 2015

2011 to 2015

Installation and welding of oil pipeline systems for Mahshahr Petrochemical with a total volume of 150,000 inches.
Client: Mahshahr Export Terminal

Installation and welding of 200,000 inches of piping, fabrication and installation of 200 tons of supports, fabrication and installation of carbon steel pipelines above 54 inches with a volume of 150,000 inches, installation and welding of 1,000 tons of structural steel, and installation of 3,500 tons of heavy equipment.
Client: Venus Company, Assaluyeh

Fabrication and installation of 3,000 tons of steel structures, fabrication and installation of 1,000 tons of supports, and fabrication, welding, and installation of 150,000 inches of pipelines for the Gachsaran Olefin Project.
Client: Nardis

2015 to2018

2015 to2018

Sandblasting and painting with a total area of 250,000 m², welding and installation of four diesel storage tanks with a capacity of 1,000,000 barrels, and installation and welding of inter-tank pipelines with a total length of 95,000 inches at Mahshahr Export Terminal
Client: Arak Machinery

Execution of aboveground and underground piping operations with a total length of 150,000 inches, including fabrication and installation of supports, painting, and sandblasting with a total volume of 4,000 tons, related to the Alfin unit of Gachsaran Petrochemical
Client: Gachsaran Petrochemical

Fabrication, welding, and installation of pipelines with a total length of 300,000 inches, including fabrication and installation of supports and metal structures with a total weight of 5,000 tons
Client: Persian Gulf Star Oil Refinery

2018 to 2021

2018 to 2021

Execution of piping operations for the Alfin unit at Gachsaran Petrochemical with a total length of 400,000 inches, including fabrication and installation of supports with a volume of 1,100 tons
Client: Panah Sanat Part

Procurement and installation of the western pipe rack with a total weight of 3,000 tons, including supply of materials and construction of the northern retaining wall of Sepahan Oil Refinery, 2,000 meters in length and 6 meters in height
Client: Sepahan Oil Company

Installation of heavy equipment at Dehdasht Petrochemical with a total weight of 2,000 tons, along with execution of underground piping and all related construction works from excavation to backfilling, with a total pipeline length of 140,000 inches
Client: Petropars


 